欢迎来访济南共润科技有限公司网站!

济南共润科技有限公司

咨询服务热线
 13153168609
当前位置: 首页 - 新闻中心
新闻中心

直线导轨的几种安装方法

来源:http://www.jngongrun.com/ 日期:2023-02-28 发布人:

随着高精密的直线导轨在工业自动化中运用的广泛性,掌握一定的安装技巧是很有必要的,正确的安装方法能提高导轨的使用寿命与使用精度。下面导轨丝杠厂家为您分析:
With the wide application of high-precision linear guide rail in industrial automation, it is necessary to master certain installation skills. The correct installation method can improve the service life and accuracy of the guide rail. The following guide screw manufacturer will analyze for you:
一、使用安装基准面安装方法
1、 Installation method using installation reference plane
先使用装配螺丝将直线导轨底部基准面大概固定于床台底部装配面,再用虎钳将滑轨侧边基准面逼紧床台侧边装配面,以确定滑轨位置后,使用扭力扳手,一定的扭力按顺序锁紧固定螺丝,将滑轨底部基准面逼紧床台底部装配面。
First, use the assembly screws to fix the bottom datum plane of the linear guide rail to the assembly surface at the bottom of the bed, and then use the vice to press the side datum plane of the slide rail against the assembly surface at the side of the bed, so as to determine the position of the slide rail, then use the torque wrench to lock the fixed screws in sequence with a certain amount of torque, and press the bottom datum plane of the slide rail against the assembly surface at the bottom of the bed.
二、从动侧直线导轨的安装
2、 Installation of linear guide rail on the driven side
1、直线块规法
1. Straight block gauge method
将直线块规置于两支直线导轨间,使用千分量表校准直线块规,使之与基准侧滑轨之侧边基准面平行,再依直线块规校准从动侧滑轨,从动轨的一端开始校准并依序以特定的扭力锁紧装配螺丝。
Place the linear block gauge between the two linear guides, calibrate the linear block gauge with a micrometer to make it parallel to the side reference plane of the reference side slide rail, and then calibrate the driven side slide rail according to the linear block gauge. Start to calibrate one end of the driven rail and lock the assembly screws with a specific torque in sequence.
导轨丝杠
2、移动平台法
2. Mobile platform method
将基准侧两个滑块固定在一个测定平台上,而从动侧只装上一个滑块,滑轨和滑块都尚未固定于床台与平台,使用附于从动侧滑块顶面千分量表,量测从动侧滑块的侧基准面,从动直线导轨的一端开始校准并依序以特定的扭力锁紧装配螺丝。
Fix the two sliders on the reference side on a measuring platform, while the driven side is only equipped with one slider. The sliders and sliders have not been fixed on the bed and platform. Use the dial indicator attached to the top surface of the sliders on the driven side to measure the side reference plane of the sliders on the driven side. Start to calibrate one end of the driven linear guide rail and lock the assembly screws with a specific torque in sequence.
3、效仿基准侧滑轨法
3. Follow the reference side slide rail method
将基准侧直线导轨的两个滑块及从动侧导轨其中一个滑块固定于平台,再将从动侧的滑轨及其另一个滑轨约略分别固定于床台及平台,以基准侧滑轨为准移动平台,从滑轨一端开始,边确认从动侧直线导轨的滚动阻力,边依序以特定的扭力锁紧装配螺丝。
Fix the two sliders of the linear guide rail on the reference side and one of the sliders on the driven side on the platform, and then roughly fix the slide rail on the driven side and the other slide rail on the bed and platform respectively. Move the platform based on the reference side slide rail. From one end of the slide rail, confirm the rolling resistance of the linear guide rail on the driven side, and lock the assembly screws with a specific torque in sequence.
4、专用工具法
4. Special tool method
使用工具确定从动侧滑轨的位置,并依序以特定的扭力锁紧装配螺丝。
Use professional tools to determine the position of the slide rail on the driven side and lock the assembly screws with specific torque in sequence.
直线导轨的几种安装方法讲解完毕了,希望给您好的帮助吧!有疑惑或者有需求可以随时来我们网站http://www.jngongrun.com留言咨询!
Several installation methods of linear guide rail have been explained. I hope to give you good help! Come to our website at any time if you have doubts or need http://www.jngongrun.com Message consultation!

济南共润科技有限责任公司